Murphy Project

RUSH LAKE, WHITEFISH CHAIN

Murphy Project

Project Size / Scope: $225k - 275k

Completed: Spring of 2025

Total renovation of landscape including:

  • Shoreline restoration

  • Beach area, steps to the dock

  • Paver sidewalks, paver patio with gas fire table

  • Paver patio with wood fire pit, water feature, landscape lighting

  • Irrigation, privacy trees, plants and sod

The entire property underwent a complete transformation, from the shoreline to the road. Our design optimized the stunning lake views while seamlessly integrating functional, beautiful outdoor living areas and elegant pathways leading to the dock.

Previous
Previous

The Stein Project

Next
Next

The Roberts Project