Murphy Project
RUSH LAKE, WHITEFISH CHAIN
Murphy Project
Project Size / Scope: $225k - 275k
Completed: Spring of 2025
Total renovation of landscape including:
Shoreline restoration
Beach area, steps to the dock
Paver sidewalks, paver patio with gas fire table
Paver patio with wood fire pit, water feature, landscape lighting
Irrigation, privacy trees, plants and sod
The entire property underwent a complete transformation, from the shoreline to the road. Our design optimized the stunning lake views while seamlessly integrating functional, beautiful outdoor living areas and elegant pathways leading to the dock.